Asked by James MacCleary Liberal Democrat to Ministry of Defence on 26 October 2026 — tabled under the Andy Burnham government

40/100 AMBER (40/100)

The reply clearly states that no elements have been removed from the approved requirement, and attributes the lower whole-life cost to a change in how costs are reported. It does not say which elements, if any, were deferred, and its explanation about the earlier figure including funding beyond the confirmed ten-year profile is only a general reference to future funding. The asker would likely need to follow up to learn which specific programme elements depend on future funding.

Scored 17 Nov 2026 — may change if this question is rescored under an updated model or prompt (see Methods)

The question

To ask the Secretary of State for Defence, with reference to the reduction of the whole-life cost in the Ground-Based Air Defence programme in the National Infrastructure and Service Transformation Authority's Major Projects Annual Report 2025–26, which elements have been (a) removed, (b) deferred and (c) made dependent on future funding.

Answer

Answered by Luke Pollard (Labour (Co-op))

The reduction in the reported Whole life Cost reflects a change to the reporting basis rather than a reduction in the approved Ground Based Air Defence requirement. The earlier figure included estimated funding beyond the Ministry of Defence’s confirmed rolling 10-year planning profile, whereas the later figure did not. No elements have been removed from the approved requirement.

How we got there

Question itemCoverageSpecificityRationale
Which elements of the Ground-Based Air Defence programme have been removed as part of the reduction in its whole-life cost shown in the National Infrastructure and Service Transformation Authority's Major Projects Annual Report 2025–26? Addressed Direct The reply states plainly that no elements have been removed from the approved requirement and attributes the lower whole-life cost to a change in reporting basis, which directly answers which elements were removed (none).
Which elements of the Ground-Based Air Defence programme have been deferred as part of the reduction in its whole-life cost shown in the National Infrastructure and Service Transformation Authority's Major Projects Annual Report 2025–26? Not Addressed Generic The reply never mentions deferral of any element; its explanation that the earlier figure included funding beyond the confirmed planning profile describes the reporting basis, not which elements were deferred.
Which elements of the Ground-Based Air Defence programme have been made dependent on future funding as part of the reduction in its whole-life cost shown in the National Infrastructure and Service Transformation Authority's Major Projects Annual Report 2025–26? Partially Addressed Hedged The statement that the earlier figure included estimated funding beyond the confirmed 10-year profile gestures at costs that depended on future funding, but it does not identify which programme elements were made dependent on future funding.