The reply clearly and directly declines to introduce a post-installation inspection and accreditation scheme, giving reasons: inspection after the fact cannot show that all requirements were met, and MCS does not allow retrospective certification. It only indirectly touches the second part of the question, whether installers would take responsibility for earlier installers' work. It never addresses liability itself, so the asker would likely need to follow up on that point.

Scored 16 Nov 2026 — may change if this question is rescored under an updated model or prompt (see Methods)

The question

To ask the Secretary of State for Energy Security and Net Zero, whether her Department will consider introducing a post-installation inspection and accreditation scheme for existing solar photovoltaic systems, enabling competent installers to assess and certify installations without automatically assuming liability for work previously undertaken by other installers.

Answer

Answered by Michael Shanks (Labour)

The Department does not plan to introduce a scheme for post-installation inspection and accreditation. MCS certification provides assurance across the full design, installation and commissioning process. Post-installation inspection alone cannot demonstrate that all applicable requirements were met, and MCS therefore does not permit retrospective certification.

How we got there

Question itemCoverageSpecificityRationale
Will the Department consider introducing a post-installation inspection and accreditation scheme for existing solar photovoltaic systems, under which competent installers could assess and certify installations? Addressed Direct The reply plainly declines to introduce a post-installation inspection and accreditation scheme, and gives reasons: post-installation inspection alone cannot show all requirements were met, and MCS does not permit retrospective certification.
Would such a scheme avoid installers automatically assuming liability for work previously undertaken by other installers? Partially Addressed Generic None of the statements mention liability or whether installers would take on responsibility for earlier installers' work; they only argue that retrospective certification is not possible under MCS, which is at most an indirect basis for the liability question.