Question

Asked by Calum Miller Liberal Democrat to Home Office on 13 November 2026 — tabled under the Andy Burnham government

68/100 AMBER (68/100)

The reply directly answers three of the four parts of the question. It states that Thames Water has advised there is some existing sewerage capacity, that no final connection date has yet been agreed, and that no maximum duration for any interim tankering arrangements has yet been agreed. It only partially answers the question about sewerage upgrades: it says further infrastructure would be needed to support the development in full, but does not identify which specific upgrades have been identified or committed, and says the permanent solution is still being worked out. A questioner would have clear status information on most points but would likely need to ask again for the specific upgrade commitments.

Scored 22 Nov 2026 — may change if this question is rescored under an updated model or prompt (see Methods)

The question

To ask the Secretary of State for the Home Department, with reference to paragraph 14.4 of the Officials’ Report accompanying the planning decision of 12 November 2026 for Site A at MOD Bicester, what confirmation the Department has received from Thames Water of (a) sewerage capacity, (b) necessary infrastructure upgrades and (c) a connection date for the proposed asylum accommodation; and what maximum duration of interim sewage tankering is proposed.

Answer

Answered by Anna Turley (Labour (Co-op))

The Home Office continues to engage with Thames Water on the wastewater requirements associated with the proposals for MOD Bicester. Thames Water has advised that there is some existing network capacity, although further infrastructure would be required to support the proposed development in full. Work to determine the detailed permanent solution and associated programme remains ongoing. Wastewater arrangements may be required pending delivery of a permanent solution. No final connection date or maximum duration for any interim tankering arrangements has yet been agreed.

How we got there

Question itemCoverageSpecificityRationale
What confirmation the Department has received from Thames Water of sewerage capacity for the proposed asylum accommodation at Site A, MOD Bicester, as referenced in paragraph 14.4 of the Officials' Report accompanying the planning decision of 12 November 2026 Addressed Direct The reply states that Thames Water has advised there is some existing network capacity, which directly reports what the Department has received on sewerage capacity, and adds that the Home Office continues to engage with Thames Water.
What confirmation the Department has received from Thames Water of the necessary sewerage infrastructure upgrades for the proposed asylum accommodation at Site A, MOD Bicester, as referenced in paragraph 14.4 of the Officials' Report accompanying the planning decision of 12 November 2026 Partially Addressed Direct The reply says further infrastructure would be needed to support the development in full, which reflects Thames Water's position, but it does not confirm which specific sewerage upgrades have been identified or committed, and says the detailed permanent solution is still being worked out.
What confirmation the Department has received from Thames Water of a connection date for the proposed asylum accommodation at Site A, MOD Bicester, as referenced in paragraph 14.4 of the Officials' Report accompanying the planning decision of 12 November 2026 Addressed Direct The reply directly states that no final connection date has yet been agreed, which answers what confirmation of a connection date has been received.
What maximum duration of interim sewage tankering is proposed for the proposed asylum accommodation at Site A, MOD Bicester Addressed Direct The reply states that no maximum duration for any interim tankering arrangements has yet been agreed, which is a direct answer to the question about the maximum duration, with the statement on possible wastewater arrangements providing context.

Feedback on this grading

Think this verdict is wrong, or that the question and answer have been mismatched? Let us know.

Submitting this needs Google reCAPTCHA to block spam, which sets cookies from google.com on your device — see our Cookies policy for details. Accept these cookies to show the form.