Question

Asked by Mr Andrew Snowden Conservative to Department for Energy Security and Net Zero on 19 October 2026 — tabled under the Andy Burnham government

78/100 GREEN (78/100)

The reply directly answers the question: it states that no assessment has been made of installations that are connected but not MCS-compliant. It explains why, noting that MCS is voluntary and its data does not capture all small-scale installations, and points to the Department's deployment statistics and the MCS installations database as the relevant sources. Because the answer is clear and committed, a member of the public would have what they need to understand the position, though they would still need to look elsewhere for any figures.

Scored 16 Nov 2026 — may change if this question is rescored under an updated model or prompt (see Methods)

The question

To ask the Secretary of State for Energy Security and Net Zero, what assessment her Department has made of the number of operational solar photovoltaic systems in England and Wales that comply with applicable electrical safety requirements and have the necessary grid connection approval but do not hold Microgeneration Certification Scheme (MCS) certification.

Answer

Answered by Michael Shanks (Labour)

The Department has not made an assessment of the number of operational solar photovoltaic systems in England and Wales that comply with applicable electrical safety requirements and have the necessary grid connection approval but do not hold MCS certification. MCS is a voluntary certification scheme, and its data does not capture all small-scale renewable installations. The Department publishes statistics on solar photovoltaic deployment by capacity and accreditation, while the Microgeneration Installations Database records MCS-certified installations. MCS provides free access to its certification statistics through its website.

How we got there

Question itemCoverageSpecificityRationale
What is the department's assessment or view of the number of operational solar photovoltaic systems in England and Wales that comply with applicable electrical safety requirements and have the necessary grid connection approval but do not hold Microgeneration Certification Scheme (MCS) certification? Addressed Direct The reply directly states that no assessment has been made of the non-MCS compliant-but-connected installations, gives a reason (MCS is voluntary and its data does not capture all small-scale installations), and points to the Department's deployment statistics and the MCS installations database as the relevant evidence.