The reply covers the question only in part. It names two concrete locations, MOD Aberporth and MOD Pendine, which were the initial pilot sites, but it says the project was planned for "numerous sites" without listing them. The asker would not have the full proposed location, so they would likely need to ask again for the complete list.
Scored 15 Nov 2026 — may change if this question is rescored under an updated model or prompt (see Methods)
The question
To ask the Secretary of State for Defence, pursuant to the answer of 6 October 2026 to question 22838 on Military Bases: Solar Power, what was the proposed location of the Photovoltaic Farms Project.
Answer
The Photovoltaic Farms Project was originally planned for numerous sites. The initial pilots were at MOD Aberporth and MOD Pendine and these demonstrated both cost escalation and the unforeseen technical constraints around energy storage reducing benefits and further impacting the economic basis for the projects. The project’s original costs were estimated at £10.2 million however, by the time the project was cancelled estimated total costs had risen to £63million, based on costings received for Aberporth and Pendine.
How we got there
| Question item | Coverage | Specificity | Rationale |
|---|---|---|---|
| What was the proposed location of the Photovoltaic Farms Project? | Partially Addressed | Direct | Statement 2 names concrete locations (MOD Aberporth and MOD Pendine) that were the initial pilot sites, which is close to the proposed location asked for. However, statement 1 says the project was planned for 'numerous sites' without listing them, so the reply does not clearly state the full proposed location and substitutes pilot sites for it. |