Question

Asked by Mr Andrew Snowden Conservative to Department for Energy Security and Net Zero on 19 October 2026 — tabled under the Andy Burnham government

77/100 GREEN (77/100)

The question asked for the public interest rationale behind the Microgeneration Certification Scheme (MCS). The reply opens by saying no formal assessment has been made, but it then gives the Department's substantive reasoning: MCS provides assurance across design, installation and commissioning, and inspection after installation alone cannot confirm that all requirements were met. It also explains that MCS is required only for access to grants and cannot be applied retrospectively. The answer is direct and specific, though its opening disclaimer could cause some confusion.

Scored 16 Nov 2026 — may change if this question is rescored under an updated model or prompt (see Methods)

The question

To ask the Secretary of State for Energy Security and Net Zero, what assessment her Department has made of the public interest objectives served by requiring MCS certification for the subsequent inspection, accreditation or market recognition of an existing solar photovoltaic system where that system can demonstrate compliance with applicable electrical safety requirements, Building Regulations and Distribution Network Operator connection requirements.

Answer

Answered by Michael Shanks (Labour)

The Department has not made an assessment of post-installation inspection and accreditation requirements. MCS certification is required for access to Government grant funding, where applicable, and is not mandated otherwise. MCS certification provides assurance across the full design, installation and commissioning process. Post-installation inspection alone cannot demonstrate that all applicable requirements were met, and MCS therefore does not permit retrospective certification.

How we got there

Question itemCoverageSpecificityRationale
What is the Department's assessment or view of the public interest objectives served by requiring MCS certification for the subsequent inspection, accreditation or market recognition of an existing solar photovoltaic system where that system can demonstrate compliance with applicable electrical safety requirements, Building Regulations and Distribution Network Operator connection requirements? Addressed Direct The reply opens with a literal statement that no assessment has been made, but statements 3 and 4 give the Department's substantive view of the objective: MCS provides assurance across design, installation and commissioning, and post-installation inspection alone cannot show that all requirements were met. Statements 2 and 5 add that MCS is mandated only for grant access and does not permit retrospective certification, which together answer the question's request for the public interest rationale.

Feedback on this grading

Think this verdict is wrong, or that the question and answer have been mismatched? Let us know.

Submitting this needs Google reCAPTCHA to block spam, which sets cookies from google.com on your device — see our Cookies policy for details. Accept these cookies to show the form.