Question
The reply directly describes what the programme is intended to cover: an enhanced Air Command and Control capability building on GUARDIAN Version 1, modernisation of the UK Air Surveillance and Control System, and a real-time recognised air picture supporting air defence and NATO air policing. It does not give timescales, costs or detailed components, so the question is answered in substance but not in full detail. A member of the public would understand the programme's scope from this reply, though they might still want more specifics on delivery and cost.
Scored 15 Nov 2026 — may change if this question is rescored under an updated model or prompt (see Methods)
The question
To ask the Secretary of State for Defence, pursuant to the answer of 7 September 2026, to question 22833 on Command and Control, what was the full scope of Project Guardian UKV2.
Answer
Project GUARDIAN UK Version 2 was intended to deliver an enhanced Air Command and Control capability for the Royal Air Force, building on the capability delivered under GUARDIAN Version 1. The programme sought to modernise the UK Air Surveillance and Control System by integrating radar, radio and tactical data link(s) to provide a real-time recognised air picture in support of the protection of UK and NATO airspace. It formed part of the wider Air Surveillance and Control System that supports UK air defence and NATO air policing activities.
How we got there
| Question item | Coverage | Specificity | Rationale |
|---|---|---|---|
| What was the full scope of Project Guardian UKV2? | Addressed | Direct | The statements set out the programme's intended scope: an enhanced Air Command and Control capability building on GUARDIAN Version 1, modernisation of the UK Air Surveillance and Control System by integrating radar, radio and tactical data links, and delivery of a real-time recognised air picture within the wider ASACS supporting air defence and NATO air policing. They do not give timescales, costs or detailed components, so the answer is substantive but not exhaustive. |