Question
The reply does not give the specific figure asked for: the additional grid capacity needed for a 100% renewable and nuclear scenario at current demand. It says the need is kept under review and describes general network planning, and it partly shifts the basis to future demand rather than the current-demand scenario in the question. The person who asked would most likely need to submit a follow-up to get a committed answer.
Scored 15 Nov 2026 — may change if this question is rescored under an updated model or prompt (see Methods)
The question
To ask His Majesty's Government how much additional grid capacity is needed to handle 100 per cent renewable and nuclear electricity generation at current demand levels.
Answer
The Government keeps any need for additional grid capacity for our future electricity system under constant review. The National Energy System Operator’s network planning considers both how electricity generation and electricity demand are expected to develop over time, rather than planning the network solely on the basis of current demand. The Government is accelerating the expansion and modernisation of the electricity network, driving reforms across strategic network planning, connections, and planning and consenting, alongside measures to make more efficient use of existing network capacity.
How we got there
| Question item | Coverage | Specificity | Rationale |
|---|---|---|---|
| What estimate the Government has made of the additional grid capacity needed to handle 100 per cent renewable and nuclear electricity generation at current demand levels | Partially Addressed | Hedged MISREADS QUESTION | The item asks for a specific estimate of additional grid capacity for a 100% renewable and nuclear scenario at current demand, but the reply gives no figure. It says need is kept under review (statement 1) and describes general network planning and acceleration (statements 2 and 3), and statement 2 shifts the basis to future demand rather than the current-demand scenario asked about. |